Straightening, widening and bridging, 1816-1841
The great roads were not made once and left. In 1816, after the last Fante campaign, Osei Bonsu ordered the two main coast roads rebuilt: straightened, cleared of roots and cut to a standard width of thirty to forty feet. The Elmina road (Route VII) was reported finished and the Anomabo road (Route VI) perhaps by 1820. The same idea was in British minds. The African Company's instructions to Bowdich in 1817 asked him to obtain a road from Kumase to the coast about six feet wide, kept clear of undergrowth, with a monthly allowance to the headmen of villages along it. Bowdich found the path between Kumase and the Pra about eight feet wide in May but 'a continued bog' when he returned in September, and saw labourers cutting a nearly straight road toward the king's country house at Breman. The Dutch governor Daendels proposed in 1816 a trunk road from Elmina to Kumase; he died in 1818 with nothing built. Under Kwaku Dua I the Elmina road was rebuilt again in 1836-38. Bridges changed too. In Bowdich's day streams were crossed on felled trees with rope handrails. After the missionary Thomas Birch Freeman brought the king a four-wheeled carriage in 1841, Kwaku Dua ordered proper bridges over the streams of Kumase: forked posts driven into the bed, beams laid in the forks, poles across the beams and about six inches of earth on top. The carriage had to be carried up from the coast.
One summary of Wilks says the 1816 rebuilding was complete by 1817; another says only Route VII was reported complete, with Route VI possibly finished by 1820.
Key facts
- In 1816 Osei Bonsu ordered the Elmina and Anomabo roads rebuilt 30 to 40 feet wide.
- The African Company asked in 1817 for a six-foot road from Kumase to the coast.
- The Elmina road was rebuilt again in 1836-38.
- Kwaku Dua I ordered timber-and-earth bridges in Kumase in 1841 after receiving a carriage.